DESCRIPTION AND RECOMMENDED USES: 100% solids, Dura-Coat Fast Curing Putty 161 is a two component ambient-temperature FAST CURING epoxy putty. It is designed particularly as a rebuilding material for metals in dry and immersion service Dura-Coat Fast Curing Putty 161 is convenient-to-use, non-sagging with good chemical resistance and high mechanical strength.

  • It can be applied up to 500 mils without slump
  • Suitable for any substrate, steel, bronze, aluminum, concrete
  • Suitable for corrosion and abrasion protection
  • Designed for filling gaps and worn areas

 

Application areas

Packages

Technical data

Maximum Temperature (Dependent on service)Wet Service | Dry Service70°C | 93°C158°F | 200°F
Chemical ResistanceWater | Alkalis | Inorganic Acids | Organic Acids | Organic SolventsExcellent | Excellent | Good | Good | Good
Solids by Volume 100%
ViscosityPaste
Mixed Density1.8
Shore D Durometer Hardness(ASTM D 2240)85
Pot life5 MIN / KG at 72ºF
Vertical SAG Resistance at 21°C (70°F) and 12.7 mm (500mils)No sag
Coverage for 10Kg kit54sf @40mils5.6m²@1mm
CoverageVaries with thickness applied
Mix Ratio2:1 by weightBase: Activator
ColorGrey as standard. Blue and Red optional. Other colors contact the manufacture
Shelf life (unopened containers)3 years at 55-95ºF (13-35ºC)

Application sheet

Surface Preparation
Proper surface preparation is critical to the long-term performance of this product. The exact requirements for surface preparation vary with the severity of the application, expected service life, and the initial substrate conditions. Minimum preparation is mechanical preparation St2/St3. Optimum preparation will provide a surface thoroughly cleaned of all contaminants and roughened to an angular profile between 75-125 μm (3-5 mil). This is normally achieved by initial cleaning and degreasing and then abrasive blasting to a cleanliness of Near White Metal (Sa.21/2), followed by removal of residual abrasive blast residues from the surface to be coated.

Mixing
Thoroughly mix Activator into Base with mixing stick or drill with low-speed mixing blade scraping sides and bottom of container or mixing board. Mix by weight 2-parts Base to 1-part Activator. Mix thoroughly to produce an even colored and streak-free material. THINNING: Never thin.

Application
Use heavy plastic squeegee or putty knife. Work material into profile of substrate to achieve maximum adhesion and to remove any entrapped air. Contour to correct form with putty knife or plastic applicator. If mold or form is used, coat its surface with a release agent to prevent adhesion of the material. Machining is possible using carbide tipped tools. Grinding is possible if done within 4 hours of application at 77ºF, 25ºC (add 1-1/2 hour for each 10ºF below 77º, subtract 1 hour for each 10º above 77ºF). Large holes and cracks can be bridged with glass or metal cloth.

Application Temperature: Keep between 55 to 95ºF (17 to 35ºC). Substrate: keep between 45 to 105ºF (7 to 40ºC). the difference in temperature of the substrate and the material should never exceed 10ºF, 5ºC. Substrate shall be a minimum of 5ºF (3ºC) above dew point. Do not apply if relative humidity exceeds 90%. If necessary, heat the metal prior to surface preparation using electric heater or heat lamp. Never use gas, oil, or kerosene heaters as they will leave a greasy residue on metal surface. For best results keep all material in warm area overnight (75ºF+) for ease of mixing.

Curing schedule

16°C (60°F)25°C (77°F)32°C (90°F)
Working Time6 mins5 mins4 mins
Functional Cure15 mins12 mins10 mins
Full Chemical1 hour30 mins25 mins

Clean Up
Tools must be immediately cleaned after usage by using industrial alkaline detergent.